Enjoy free shipping on orders above $60!

Sale!

Fanshiontide Dog Training Lead Leash 10m/33ft Long Lead For Large Medium and Small Dogs Long Dog Recall Lead Recall Obedience Line Leash for Pet (Black)

Original price was: $34.99.Current price is: $10.49.

Category:

Description

Widely applicableSuitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds. Long LeadThis training leash is great for teaching your dog recalls. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play or swimming. Swivel-style Zinc Alloy BuckleThe dog lead comes with a Swivel-style Buckle for easy to attach to your dog’s collar, rotated by 360 degree secure your pet to play in any way safely. Durable Training LeadThis durable polypropylene dog training leash will outlast nylon leashes. All stitching is reinforced and the metal buckle made of zinc alloy is high quality and durable. Leash Size10M 33Feet 2CM. Our extra long lead has the length needed to allow them to wander and ensure your command to come.

Reviews

There are no reviews yet.

Be the first to review “Fanshiontide Dog Training Lead Leash 10m/33ft Long Lead For Large Medium and Small Dogs Long Dog Recall Lead Recall Obedience Line Leash for Pet (Black)”

Your email address will not be published. Required fields are marked *